Solid Waste Incinerator Medical Waste Burning Machine

Product Details
Customization: Available
After-sales Service: Lifetime
Warranty: 12 Months, 12 Months
Still deciding? Get samples of US$ 9000/Set
Request Sample
Manufacturer/Factory, Trading Company
Gold Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
OEM/ODM Availability
Yes
  • Solid Waste Incinerator Medical Waste Burning Machine
  • Solid Waste Incinerator Medical Waste Burning Machine
  • Solid Waste Incinerator Medical Waste Burning Machine
  • Solid Waste Incinerator Medical Waste Burning Machine
  • Solid Waste Incinerator Medical Waste Burning Machine
  • Solid Waste Incinerator Medical Waste Burning Machine
Find Similar Products

Basic Info.

Model NO.
Solid Waste Incinerator
Condition
New, New
Automation
Automatic, Automatic
Treatment
Burning, Burning
After-Sales Service
["Lifetime","Lifetime"]
Certification
ISO
Screw
Multi-Screw
Capacity
10~800kg/H Solid Waste Incinerator
Working Temperature
850~1300c Solid Waste Incinerator
Negative Pressure
5-35 mm Wc
Electrical Power
7kw
Total Weight
~1500kg
Application
Hospital/Industry/Household/Vessel
Waste
Solid/Liquid/Gas Waste etc.
Incinerator Type
Closed Smokeless Incinerator
Transport Package
Standard Package
Specification
10kg~800kg/h
Origin
China Incinerator

Product Description

SOLID Waste Incinerator Medical Waste Burning Machine

Description of Solid Waste Incinerator :
The Gathering marine incinerator, which is designed for on board incineration of ship's waste oil and solid, it mainly consists of four parts: 
A. Combustion chamber with diesel oil burner, sludge burner, and electric control panel. 
B. Flue gas fan 
C. Flue gas damper. 
D. Sludge tank with circulating pump and heater. 

Solid Waste Incinerator Medical Waste Burning Machine
Solid Waste Incinerator Medical Waste Burning Machine
Details of Solid Waste Incinerator: 
The incinerator is equipped with single door in front, which are intended for loading 
Of solid waste and ash removing, the incinerator in stand-by mode(COM. Tem. Less than 220° C), the doors can be opened properly. If the incinerator is running in cooling down mode, the door can be opened till COM. Tem. Less than 100° C and incinerator fully stop. 

The electrical control panel is installed on the incinerator and it contains fuses, starters, PLC and 
Operator panel. The electric panel is built according to international standards for marine equipment. 

The operator panel which is located at the right side of the control panel has a touch screen and 
Defined keys for system starting/stopping and selecting burner modes. The burning process is controlled by the PLC and monitored by the HMI(human machine interface)and scanned by a photo resistor. The combustion chamber temperatures are also regulated automatically by the PLC control system.
 
Main Features of Solid Waste Incinerator
Gasified pyrolysis incineration is used foe burning many kinds of waste.Waste can be burned once everyday by gasified incineration.Gasified incineration ,mixed incineration and burnout treatment ensures low       emission standard of dust,dioxin etc.Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.Compact structure and small land occupation.

Solid Waste Incinerator Medical Waste Burning Machine

Technical Parameters of Solid Waste Incinerator
No. Item Spec.
1 Burning capacity 10kg~800kg/h
2 Incinerator size 1.8m*1.15m*3m
3 Volume of incinerator Gas room 0.5m³,Secondary burning room 0.3m³,Mixing combustion room 0.04m³
4 Size of waste inlet hole 620mm*800mm
5 Chimney Height 10m, outer diameter 280mm
6 Air blower 0.25kw
7 Combustion burner 0.11kw,fuel consumption 4~10kg/h
8 Re-combustion burner 0.11kw,fuel consumption 4~10kg/h
9 Running- voltage 220V/380V
10 Weight About 4000kg

Marine Incienrator is workabale 
Solid Waste Incinerator Medical Waste Burning Machine


Welcome to contact us for details if you are interested in Solid Waste Incinerator or other waste management.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier